Helpful Links

  • Online Sewer Bill payment link through Lunenburg website (also accessed from "How Do I" on Lunenburg Home page drop-down button)
  • Lunenburg Sewer Commission Fee Schedule (PDF)
  • Lunenburg Maps Online with Property Information - The town map is online.  Search by parcel address or owner to see Sewer Service Area delineation, Sewer System details, and other map details available to you.  (Note: Microsoft Silverlight is needed to view maps.  To install, visit the Microsoft Website)
  • Lunenburg Department of Public Works
  • Comprehensive Wastewater Management Plan - The Town of Lunenburg's Comprehensive Wastewater Management Plan (CWMP) produced by Wright-Pierce Engineering was completed in March 2010. Phase IV - the Final Plan - was then updated in 2016, again by Wright-Pierce Engineering.
    • Phase I: Assessment of existing conditions, projection of future wastewater disposal requirements, and a needs assessment for the Town. The needs assessment will determine areas with need further study in Phase II;
    • Phase II: Identify and short-list appropriate means of handling the wastewater management methods to address the areas identified in Phase I. The analysis will include a review of technical, environmental, institutional, and economic factors;
    • Phase III: Detailed evaluation of alternatives identified and short-listed in Phase II, and a recommendation of a specific wastewater management plan for each area; and
    • Phase IV: Finalize a specific wastewater management plan for each area.
    • Links for Phase I (completed April 2007) and Phase IV - updated in 2016 are below.   Hardcopy of Phases II & III can be found at the Sewer Business office and Lunenburg Library.